Is run in process of capital-restoring repairs.
Installation of additional devices and mechanisms provides improvement of technical characteristics of the machine when executing lining-tamping-surfacing works in a process of mid-life, capital repairs and railway track building.
Modernization gives the machine new functional abilities:
- automatic track alignment on a level, longitudinal profile and in projection;
- electronic registration of a track position;
- calculation of the shifts for a track installation into a design position;
- hydroficated control of the executive devices.
There is possibility for installation of a ballast pick-up similar with to ВПО-3-300 machine type upon a customer’s requirement.
Technical characteristics
|
С3-240-6 |
С3-160-4 |
Capacity, m³ |
240 |
160 |
Quantity of storage cars, pc. |
6 |
4 |
Unloading time, min (no more than) |
15 |
8 |
Power of energy plant, kW |
200 |
200 |
Length on the automatic couplers axes, m |
102,5 |
73,1 |
Weight, t |
284 |
197 |
Service staff, pers. |
2 |
2 |
Conveyer belt speed, m/sec: |
|
|
working of the accumulation conveyors |
0,06 +/- 0,01 |
0,06+/-0,01 |
the accumulation conveyors when unloading |
0,12 +/- 0,015 |
0,12+/-0,015 |
an intermediate conveyer |
3,0+/-0,2 |
3,0+/-0,2 |
a rotating conveyer |
3,0+/-0,2 |
3,0+/-0,2 |
Range of rotation angle of rotating conveyer from a track axis, degrees |
from 0 up to 75 |
from 0 up to 75 |